KATHMANDU, JUN 26 - With the rise in water current after the prominent monsoon rain, Nepal Electricity Authority (NEA) has reduced the daily load shedding by an hour. Now there will be only five hours of load shedding.
However, NEA officials said that the load shedding could not be waved completely as the supply of electricity is still far from reaching the demand.
They said that only 590 Mega Watt of electricity is supplied while the demand is 960 Mega Watt.
Source: http://www.ekantipur.com/2012/06/26/top-story/load-shedding-reduced-by-an-hour/356204/
0 comments:
Post a Comment